近期项目

一、武汉大学珞珈雅苑(一期)
珞珈雅苑(一期)项目位于武汉市洪山区珞狮南路与二环线交汇处,总建筑面积为44万㎡,其中住宅面积约38万㎡(计3312套),住宅共15栋,楼层为30-32层;配套商业、办公楼1栋,面积约1.6万㎡,楼层为9层;幼儿园1栋,3层,面积0.2万㎡。地下室面积约4.3万㎡。项目配建停车位2233个(其中地下停车位1350个),容积率为3.49,绿地率为35%。
该项目建设周期为28个月,为2012年3月至2014年7月,总投资金额约21.5亿元。

1.WuHan University LuoJiaYaYuan(First)
LuoJiaYaYuan located in South Luoshi Road, HongShan , WuHan. Total building area for 440,000 square meters(473,000sqf), living area has 380,000 square meters(409,000 sqf).
This project has 3312 apartments, 15 buildings(30-32 floors) in there. Supporting commercial including one 9 floors business building about16,000 square meters(17,200 sqf), one 3 levels kindergarten about 2,000 square meters(2,150 sqf). Underground has 43,000 square meters area(46,200 sqf) with 2,233 parking lots in there. Afforestation is 35%.
This project took 28 months, from March 2012 to July 2014, total investment of 2.15 billions RMB.

二、中国地质大学教师住宅小区(二期)
中国地质大学(武汉)教师住宅小区(二期)项目位于武汉市洪山区关山街彭王村。项目总建筑面积约10万㎡,其中:住宅面积约8.3万㎡(计713套),共6栋住宅,楼层为29-32层;地下室面积1.3万㎡。项目配建停车位420个,项目容积率为3.9,绿地率为35.2%。
该项目建设周期26个月,2011年2月至2013年4月,总投资金额为5.3亿元。

2. China University of Geosciences (Second Teacher Property)
China University of Geosciences(second teacher property) located in GuanShan Ave, HongShan, WuHan. Total building area for 100,000 square meters(107,600 sqf), living area has 83,000 square meters (89,300 sqf). This project has 713 apartments, 6 buildings(29-32 floors) in there. Underground has 13,000 square meters area(13,990 sqf) with 420 parking lots in there. Afforestation is 35.2%.
This project took 26 months, from Feb 2011 to April 2013, total investment of 530 millions RMB.

三、江汉大学教职工住宅
江汉大学教职工住宅项目位于武汉经济技术开发区博学路1号。项目总建筑面积约20万㎡,其中:住宅面积约18万㎡,共30栋住宅,楼层为3-12层,有小高层,多层,联排别墅等;地下室面积2万㎡。项目配建停车位660个,项目容积率为4.5,绿地率为40%。
该项目建设周期26个月,2005年5月至2007年7月,总投资金额为3.5亿元。

3. JiangHan University Teacher property
JiangHan University Teacher Property located in 1 BoXue Road,economic and technological development zone ,WuHan. Total building area for 180,000 square meters(215,000 sqf), living area has 180,000 square meters(193,700 sqf). This project has 30 buildings(3-12 floors) in there, including apartments, house, townhouse. Underground has 20,000 square meters area(21,500 sqf) with 660 parking lots in there. Afforestation is 40%.
This project took 26 months, from May 2005 to July 2007, total investment of 350 millions RMB.